------------------------------------------------------------------------- APVV-0816-11 PROJECT MEETING 2014/12/17 09:30 pritomni : Ambroz, Bodnarova, Gomory, Kavka, Koza, Rybak, Schwartz ospravedlneni : Kucera, Komzik, Kozak ------------------------------------------------------------------------- PROGRAM STRETNUTIA: 1/ agenda: - rozpocet: kratenie 11%, -> AsU 20% plnych, nic pre LSO uprava sluzby (3) + energie (1) -> material aktualny stav - odmeny : APVV 3972, LSO z OFS 1180, LSO z AsU: 210 - nakupy : literatura - vyrocna sprava AsU 2014 2/ personal/topical reports: JKavka: - db LSO podnety od JA,PG,PS,JR: logs i s images,...m Xcen,Ycen do buducna, all oznacenie, export zoznamu do TXT, cislovanie requestov, mazanie starych vtstavenych dat, online/offline data, rozmiestnenie a nahrada starych diskovych poli tak aby sa nezvysila spotreba el. prudu a nevyzadovalo dodatocne chladenie JA(+MK+PH): - PDSS - novy uhrgang - SF3 - LabVIEW, diskove polia LS+SL, UPSky JR: - personal report (E) Vyvoj a realizacia pristrojoveho vybavenia observatoria - LSO) 1/ UHRGANG - PORUCHY + OPRAVY + PLANY - porucha 1: nefunkcne pointovanie v alfa - vahadla spinania korekcie v alfa - porucha 2: prehrievanie elektroniky stabilizacie otacok uhrgangu - porucha 3: zlomenie osky medzi uhrgangom a uhlovou prevodovkou 2x - oprava a mozne priciny: PH,JK,MKollarik,JKlein - stav: hlavny uhrgang, nahradna uhlova prevodovka s oskou, dnes slabe miesto existuje - testy: 12+15/12/2014: 12/12/2014: - uhrgang alone: 07:29-07:59 OK, 30min OK - uhrgang + pointer R closed loop: 07:59-08:15 + 08:26-08:36 + 08:43-09:40, t.j. 2h13min OK - uhrgang + pointer R closed loop + pointer H closed loop: 09:46-10:36, t.j. 50min OK napriek 10:18 push of slave for 0.2mm in a/d to test actions: some moments with RED LEDs until adaptation reached, continuous action of pointer R during transitions - celkovo uhrgang ON 3h07min a OK 15/12/2014: - uhrgang alone: 07:02-07:20 OK 18min - uhrgang + pointer R closed loop: 07:28-07:53 25min OK - uhrgang + pointer R closed loop + pointer H closed loop: 07:53-08:27, t.j. 34min OK - celkovo uhrgang ON 2h25min a OK - poucenia : komplexne riesenie zakladneho pohybu v alfa a delta kr. motormi + hrube pohyby v alfa/delta + jemne pohyby v alfa/delta + pointer R - nakup motorov, prevodoviek, el. driverov, Arduino boards - prace: p.Klein, PH, JA (MK), snaha o vyuzitie exisujucej elektroniky, LV->C - stary uhrgang + delta motor ako nahrada 2/ UMELE MESIACIKY - STARE + NOVE - prelestenie oboch sad v UMMS SAV BA (600 Eur) - vyroba dodatocnych mesiacikov: 29.5, 27.8., ...., 31.8 mm - celkovo 1x23 kusov - zistenie materialu povodnych mesiacikov - UMMS SAV BA, ZEISS neuspesny - vyroba 2 ks testovacich prototypov k 8/12/2014 Zistene veci ktore treba doriesit: - rozmer clonovej casti "vyrazit" na zadnej strane (28.5mm) - bocnu stenu clonovej casti skosit ako uvedene na plane, t.j. 45 stupnov s minimalnou vyskou zvisleho zostatku steny aby sa netvorili zuby na hrane (cize nebrusit tuto hranu do ostria) - odraz prilis odkloneny od optickej osi pristroja: svetelny zvazok prechadzajuciu vystupnym sklickom z koronografu von je posunuty o ~7mm k strane sklicka prec od osi koronografu, t.j. uhol odrazu svetla od odrazky (jej naklon voci op.osi koronografu) je o 1.33 stupna vacsi ako treba. - odrazka osvetluje vyraznejsie i celu plochu sklicka a tak na kupole vidiet jasne obrubu sklicka ako hranu osvetlenia okolo asymetricky umiestneneho odrazu z odrazky - pricina nateraz nejasna - pokus o suknicku - pokus o pozorovanie s prototypom a analyza dat -> UMMS SAV BA 3/ POINTER H - zjustovanie nutne a urobene posunom dosky elektroniky mastera v a/d - stav: funkcny, len male zmeny do 0.5mm - pouzivany len v pripade sucasnych pozorovani s CoMP-S+CorMag - test presnosti umelym posunom obrazu na slave - actual todo: 1/ online prenos do PC 4/ CoMP-S - regulane pozorovanie - logovanie, printscreeny,... - poriadok s kablami - ohrev dostatocny - chladenie kamier prerabane, skoro uplne dostatocne - problemy s redukciou - profily/pol_kalibracie ... testovanie: 1/ FLAT 656 a 854 ciar - ocakavane stvorice rovnakej intenzity cez profil ciary (priemer z celeho FF_SOURCE) -> snimky raz chybaju inokedy su dvakrat, testy celkovo z 5 dni 2/ RIADIACE SIGNALY NLC 1-4, FLC 1-2 -> OK 3/ TIME STAMP: BCD + ASCII timestamps -> OK a zavedene 4/ neriesit, sustredenie sa na PDSS s ANDOR a Goodrich kamerami - MK, redukcia PCO dat podla counter/time stamp - JR 5/ PDSS pre CoMP-S: - kontrola zmeneneho uchytenia PDSS k filter modulu CoMP-S 19/09/2014: OK az na detaily - priprava ovladania kamier Goodrich a ANDOR do LabVIEW CoMP-S: MK do 11/01, - instalacia: JA+JR+... 12/01 balenie, JA+JR 13-15/01 instalacia na LSO MK@LSO 16-18/01 ... PDSS box, 4 kamery, 3x polohovace, ohrev+chladenie, PC3, diskove pole, opticke kable a prevodniky 6/ CORMAG: - 06, 09, 11/ 2014 - Taliani na LSO - problemy s duchmi - riesenia, zvysky - testy v Torine - filter, pred-filter OK - instalacia v kolimovanom zvazku s naklonenym predfiltrom a IR blokovacim filtrom - tepelna izolacia a ohrev - pozorovania s CoMP-S - problemy s phot_redukciou - FLAT + vignetting -> zmensene zorne pole: final CorMag FoV is ~500" x 700" (~450" radial extend above the limb and ~20 degrees in position angle along the limb). 7/ SCD: - termin 1/3/2-15 + nasledna instalacia na LSO na jar - CHROMAG@HAO a SCD@LSO - SCD: proposal a jeho rozsirenie pre achromat objektiv, full-disk FoV, two cameras - deWijn v TL -> JR+Steve Tomczyk v Toulouse - suhlas s rozsireniami - 2 designs: 1/ singlet design, 2/ 150/2250 design; full-disk FoV for 150/2250 design; two cameras for both designs - stav: - heat rejector potrebny, zmensenie apertury i tak nutne! - chladenie SCD boxu - HX-200 - electronics box - mechanical interface for singlet design - optics - pre-filters + lines - SCD box general structure: - 2014/06/20 - space limitations + additional restrictions: singlet design - 110cm 150/2250 design - 36x45cm - plan: HAO-dodavka, AISAS-priprava na LS(PC,diskove pole,kable,mech_interface), HAO istalacia v singlet design, AISAS sam neskor-presun na 150/2250 design 8/ TOULOUSE COST WORKSHOP: - presentation of the LSO/AISAS, report on Goodrich cameras - 1st tests - ideas/suggestions for LSO: 12/01/2014 ? presun na 2/2/2014 kvoli PS 9/ TODO 2015: - CoMP-S: PCO data + kontrola flat+vigneting,... - PDSS : IR lines, VIS lines... - SCD : all - uhrgang alfa + delta + pointer R + ovladanie z PC - otacanie kupoly automaticky - CorMag: flat + vignetting,... - prach : optika, kupola - personal report (A/ Dynamicke procesy a ohrev slnecnej korony) 1/ spoluporaca a AsU AV CR Ondrejov : H.Meszarosova, M. Karlicky - praca v ApJ - vystupy numerickeho modelovaia a WT filtracia+analyza - priprava dat 2 erupcii z SDO/AIA pre analyzu indukovanych vlneni 20120818, 03-05UT, 9 kanalov 20140910, 17:20-19:20UT, 9 kanalov - priprava soft pomocok: - arbitrary line selection in XY-T cube - arbitrary inclined 2D area selection in XY-T cube - 2D data cube XYT data view (IDL-slicer3, ADW-xslice) MB: personal report - 1 slide, ukazka Hinode/SOT - SP + NFI data setu od DU, diskusia o pouziti dat - PS,JK,JR,PG, na BK este vysledky neiste doporucene smerovanie: GBPs dymaniucs + SP inverzia, ponuka viacerych takychto data setov od PG PG: - personal report (B) Podstata vlneni a suvis s erupciami a koronalnymi vyronmi hmoty) - VTT kampan 02-16/09/2014 Trvanie: 2.9.2014 - 16.9.2014 Nazov: Topology and physical parameters of the magnetic fields in solar filaments. Pristroj: VTT, COMP-S. - kampan: Spectroscopic study of "magnetic tornadoes" - HOP255,HOP 237 Trvanie: 18.5.2014 - 20.5.2014 Trvanie: 12.7.2014 - 20.7.2014 - bez prezentacie, len informacia o stale neistom vystupe zo ziskanych dat VTT kampane i EIS/Hinode pozorovani - HOPXXX novy hotovy ale nepusteny v septembri, vela ciar EIS pre DEM plazmy pri prechoe cela vlny, snaha o opakovanie AK: personal report - nepritomny JKoza: - personal report (D) Odozvy chromosferickych spikuli v korone) - THEMIS kampan 2014, https://www.astro.sk/~koza/themis2014/ Trvanie: 28.7.2014 - 7.8.2014 - prezentacia: info o stave spracovania THEMIS 2014 dat - dohoda o tlaku na ALA so snahou o pobyt v Toulouse na PCA analyzu He D3 dat nasej 2014 kampane z THEMIS PS: - personal report (C/ 1D-3D NLTE modelovanie a dynamika slnecnych protuberancii) - DAAD-SAV projekt 3/ 2015: cestovne - pobyty a konferencie POBYTY: MB: - PG: 2 tyzden Graz: total 700+(650+100)=700(1450) AK: - JK: 2 tyzdne (COST STSM mission?) JR: Pic du Midi - ~800 Eur Ondrejov - 2x~100 Eur ak dostaneme MAD, inak 2x~300 Eur PS: - KONFERENCIE: - Bairisch Kueldorf ? - 2nd SOLARNET Meeting: Solar and stellar magnetic activity in Palermo, Italy. February 2-5, 2015 http://www.astropa.inaf.it/Solarnet2015/Solarnet2015.html - - Measurement Techniques for Solar and Space Physics, in Boulder, CO, USA. April 20 - April 24, 2015 - - EWASS 2015 (incl. The Sun under the microscope), in La Laguna, Tenerife, Spain. Symposium S5 22 – 23 June 2015 The Sun under the microscope - - Loops7: Heating of the Magnetically Closed Corona, at the University of Cambridge, July 21-23, 2015 - - Joint Solar Orbiter-Solar Probe Workshop, in Florence, Italy. August 31 - September 4, 2015 ? - Future of polarimetry, COST Action MP1104 final meeting, Brussels, 21-23/09/2015 JR - COST support, 1x CoMP-S+PDSS poster - Hinode-9, in Belfast, Northern Ireland, UK September 14-18, 2015 ? - Coimbra Solar Physics Meeting: "Ground-based Solar Observations in the Space Instrumentation Era", Coimbra, Portugal. October 5-9, 2015 31 May 2015 - Closing date for abstract submission PS - 1x CoMP-S+PDSS poster, 1x ... 4/ 2015: sluzby a prijatia MB: ? PG: ludia z Grazu ? AK: - JK: ? JR: Pic du Midi - Kuechlin ~300 PS: clanok v ApJ - ~800 5/ 2015: popularizacia DoD LSO: PG - 4x: 18/7, 25/7, 1/8, 8/8 6/ 2015: nakupy literatura: z 2014 + JK literatura o optike ? 7/ 2015: vystupy PS AA in press Total mass of six quiescent prominences PS ApJ sumitted ApJ s Heinzel+Jejcic MB SP to be submitted januar ? 8/ 2015: kampane zaver diskusie: VTT nie, len GREGOR po skusenostiach z 2014 9/ rozne: JR - RK - kvoty nutne i na: /RAIDofsA, penumbra:/home (50GB) JR - RK - konta penumbra: /home/guests/ ? averonig dnovocky grant lofdahl meszarosova ne prochazka semeida stomczyk yadav calogovic drews hbalthasar milanmin ostrbak rbrajsa smanrique temmer atchirova ckuckein falco joshi mbenko mmocak pereira rkomzik STARA_UMBRA vanko email vsetykm v v ofs@astro.sk - termin 10/1/2015 JR - RK - 21/09/2014: penumbra OS linux/fedora 64bit + IDL 8.3 nonovo SSW s SSWDB s automatickym "updatom" denne o 00:30 UT 10/ next meeting APVV: 2/2, 9/3, 20/4, 15/6, DD/09, DD/12 02/00, 12:30 - JK - ESPM 2014 - JR - Toulouse workshop next LSO meeting: 27+28/01 LS ? 11/ Novy rok 2014! Vianoce !