------------------------------------------------------------ APVV projekt miting - 9 ------------------------------------------------------------ 24.6.2009 09:30 (+1015) Program: 1/ done 2/ plan cerpania financii 3/ info z poslednych podujati 4/ postup prac na temach 1/-4/ grantu na rok 2009 5/ M.Bodnarova - presentation for Summer school 6/ rozne 7/ todo 8/ plan dalsich stretnuti ------------------------------------------------------------ ------------------------------------------------------------ 1/ DONE: - HM ApJL/AA on radio drifting tadpoles - re-submitted - SF2: LS pier/mount/platform: - studia + vyroba - SF 2 - 10000+34000 Eur - OK IDL - 2200 Eur - OK zber dat + ovladanie pozorovani - OUT -> AsU VEREJNE BLAHO-sietovanie nove SECIS kamery - OUT -> SF2 chnges if possible - prednasky: JR - Ondrejov 9/6/2009 - JR/Ondrejov - MAD pobyt 1-10/6 + Karlicky project 11-12/6 + cestovne: ~80 - JK - knihy - JR - zaujemca o miesto elektrotechnika - JR - ziadost o zapocitanie reportovaneho podielu na praci grantu - akceptovane ------------------------------------------------------------ ------------------------------------------------------------ 2/ Prachy - JR: prisla 2. polovica 2009 - prachy : 325tisic/10,788.02 - cestovne: 218 000/7,236. (vyslania) - material: 70 000/2,323 - AsU = - sluzby : 30 000/995.82 (prijatia,postovne,cohokolvek) - energie : 7 000/232.36 (energie) - tlac + ubytovanie na AsU - VEGA projekt - cestovne: vyslania: 218000/7,236. - JR/Freiburg 1-22/4/2009 - 100+293.68=393.68 len cestovne (ostatne DFG) - MB+JR/Graz 11-24/5/2009 - 100+100=200 -> ~140 EUR len cestovne (ostatne MAD) - JR/Ondrejov 1-12/6/2009 - -> ~80 EUR 599 z 7236 - MB/USO School "Solar magnetism" 28/6-4/7 2009: ~600 Dwingeloo, The Netherlands - JR/Zurich - 1x - MB,JR/BK 4th CESPM - 30/9-2/10/2009 - MB,JR/Graz: 16-30/11 - APVV AT-SK projekt (APVV 0066 cestovne) 01-06/12 - APVV 0066 projekt - diety - sluzby : prijatia+postovne+...: 30 000/995.82 - xerox planov - 27.26 - kupa planov - 220.48 pokus o presun na material - PR+KR diety - 97+97 5-8/4/2009 - RH+FB ubytovanie - 166.50 - RH+FB diety - 104.56+104.56 - postovne - <10 822 z 995 - HM - 15-28/7/2009 - MAD - O Sk - PR+KR - diety,listky - 1x - 1x2x4x25=200 Eur - HB - diety - 7x25= 175 Eur - A - AT-SK + MAD? - 0 - RB - ? - material: 70000/2,323 - AsU literatura - ~20 ? - knihy - ~10 Keenan 139.47 - kancelarsky material - 261.04 (68.09+65.78+70.17+57.00) - SECIS - 9.13 - pasky - 94.65 - pertinax,silon - 149.94 - determm. filter 654.23 z 2323.57 - guider: 2 singlet lenses - ~200 Eur - energie : 7000/232.36 - elektrina ------------------------------------------------------------ ------------------------------------------------------------ 3/ INFO Z POSLEDNYCH PODUJATI: - JR: Ondrejov: - HM,MK - 8/10/2008 event XRT + RADIO (OND,ZURICH,TRIESTE) - JJ - shocks from Hinode - MK - numerical simultions of reconnection - MK - wavelet software - PH - Probe3 - prednaska - mladi zo SR - DUDIK: - US 16/6/2009: ponuka na kratky pobyt pre rozsirenie nasich pozorovacich kampani o non-MAXWELL diagnostiku EIS,XRT,TRACE ~3-9/10/209 ------------------------------------------------------------ ------------------------------------------------------------ 4/ POSTUP PRAC NA TEMACH 1/-4/ GRANTU - 2009 --------------------------------------------- 1-NETWORK DYNAMICS: JK: emerging bipole 6/6/2008: JK - ha coali dynamic fibrils 28/5/2008 fibrils Freiburg -> journal PG: emerging bipole 6/6/2008: PG - doplnky pre CB+HB AA paper dorobit 19/10/2005: CDS data for MB MB: DOT G-band data 19/10/2005 ~ 1st~2nd algorithm JR: emerging bipole 6/6/2008: JR - ha and tesos to all --------------------------------------------- 2-MICROFLARES: SS: - search for the WL counterpars (Jess et al). AV: 6/7/06 flare: action: final interpretation (BV), writing this year JR: 22/08/2007 - filament fall: last data to system XRT with corrections --------------------------------------------- 3-VLA DATA: JR: 1/ idea - CDS+SUMER+EIT EM+T: RB discussions: non-problematic solution to find 2/ idea: 171/195 EM,T and CC pokus o TESIS/CORONAS: 171 + 304/302 kanal prace v juni,juli,aug --------------------------------------------- 4-SECIS: done : - uhrgang - KM - closing of the dome slit: found reason - KM todo : - guider - improved mechanical fixing - J,p.Klein - final electronics - JA - heating - final version - JA - filter tests - all 3 filters - JA,JR - closing of the dome slit: repair - KM+FB - new electronics og the uhrgng/alpha_drive - JA ------------------------------------------------------------ 5/ MB PRESENTATION FOR SUMMER SCHOOL ------------------------------------------------------------ 6/ ROZNE: ------------------------------------------------------------ 7/ TODO: visitors : - A. Veronig, M. Temmer, S. Stoiser, D. Utz, P. Gomory - JR,MB,JK IGAM/Graz (Austria), 06-12/07/2009 seminar 7, diskusie 8, SP, vylet - H. Meszarosova AsU AV CR, Ondrejov (Czech republik), 15-28/7/2009 - JR WT analysis of 1D radio and 2D Hinode/XRT data - A. Hanslmeier - JR IGAM/Uni Graz (Austria), 09-15/8/2009 TESOS 6/6 5576 data with 0.5" degradation - P. Rudawy + K. Radziszewski - JA,JR (AI, Uni Wroclaw (Poland), XX-XX/09/2009 SECIS installation+teaching - K. Philips (MSSL, UCL, London (Great Britain) - JR XX-XX/09-10/2009 visit of his SECIS, lecture, TESIS observations JR - RB,HB visits JKJR - new TIP data sets for HB - fibrils - JK, shocks - JR RK - 5->50 licencii, 1 /home/user tree on all servers - IDL + floting licence JAJR - meranie priehybu koronografov JAJR - SECIS obsevations sept-nov PAPERS: SS - AA microflares AV - AA 6/6/2007 flare JA - CAOSP SECIS PG - AA emerging bipole JR - AA VLA data fig.4 CC 195/171 data HM - A&A letter MB - DOT data G-band 2 approach test - 4thCESP->CEAB ------------------------------------------------------------ 8/ PLAN DALSICH STRETNUTI: 7+8/07/2009: AT-SK meeting ------------------------------------------------------------ ------------------------------------------------------------